DID YOU KNOW?
Our new library is being built with resilience as a priority.
It will include:
Basement concrete pressure slab and waterproofing
Grading to divert water away from the building
Replaced and reactivated storm drainage system
Generator connection
Alarmed backflow valve
Duplex sump pump
Vents and louvers above flood elevations
Dedicated outdoor air system for dehumidifying
Physical plant systems located on the roof